docs(gitea): a skipped job reports SUCCESS, not pending -- correct the deadlock claim
The runner came up on 2026-09-29 and the first CI jobs this repo has ever run went green, which falsified a claim merged in #2. MEASURED: gate / gate (pull_request) success 1m58s (PR 1), 1m34s (PR 2) gate / gate (push) success 1m32s (PR 2 only) gate / conformance (pull_request) success "Has been skipped" #2 said listing the conformance context as a required check would deadlock every PR, because the job is `if: false` and never runs. That is wrong. Gitea reports a skipped job as SUCCESS. Requiring it would not deadlock anything -- it would pass VACUOUSLY, forever, while nothing ran. The conclusion is unchanged (never require it) but the reason inverts, and the corrected reason matters more: under HARD RULE 4 a permanently-green check that verifies nothing is worse than a deadlock. A deadlock is loud. This is the exact fail-open shape the 2026-09-18 audit and this one both keep finding. Also records that the (push) contexts only appear for branches matching gate.yml's push trigger -- feature/**, fix/**, docs/**, chore/** -- and NOT feat/**, which is why PR 1's feat/ branch produced only pull_request contexts. Require the pull_request context alone, or PRs from non-matching prefixes never satisfy the rule. CLAUDE.md's enforcement table is updated: the runner half is genuinely fixed and observed green, the branch-protection half is not. Adds the warning that a green tick is not by itself evidence that anything ran. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
This commit is contained in:
1 parent
69a0d1a1c7
commit
234cc6a71a
2 files changed
+35
-10
No files matched your search
+26
-3
@@ -54,6 +54,29 @@ commands.
|
||||
4. Add the human reviewer as a repo collaborator, then raise `required_approvals` to 1.
|
||||
|
||||
> **Do not do step 3 before step 1.** A required status check with no runner leaves every
|
||||
> PR permanently pending — including the PR that would fix it. The same applies to
|
||||
> `gate.yml`'s `conformance` job: it is `if: false` and never runs, yet still publishes a
|
||||
> `gate / conformance (pull_request)` context. Never list that one as required.
|
||||
> PR permanently pending — including the PR that would fix it. That half is measured: PR #1
|
||||
> sat `pending` for 30.6 minutes across 122 polls with no runner registered, and never
|
||||
> reported.
|
||||
|
||||
### Measured, once the runner came up (2026-09-29)
|
||||
|
||||
The first CI jobs this repo ever ran, on PR #1 and PR #2:
|
||||
|
||||
| Context | Result | Time |
|
||||
|---|---|---|
|
||||
| `gate / gate (pull_request)` | success | 1m58s (PR #1), 1m34s (PR #2) |
|
||||
| `gate / gate (push)` | success | 1m32s (PR #2 only) |
|
||||
| `gate / conformance (pull_request)` | **success — "Has been skipped"** | — |
|
||||
|
||||
**Require `gate / gate (pull_request)`. Do NOT require either `conformance` context —
|
||||
but not for the reason an earlier draft of this file gave.** A skipped Gitea Actions job
|
||||
does not hang a status check: Gitea reports it as **`success`** with the description
|
||||
"Has been skipped". So requiring it would not deadlock anything — it would pass
|
||||
*vacuously*, every time, forever, while nothing ran. Under HARD RULE 4 that is worse than
|
||||
a deadlock: a deadlock is loud, a permanently-green check that verifies nothing is
|
||||
exactly the fail-open shape this repo keeps finding.
|
||||
|
||||
The `(push)` contexts appear only for branches matching `gate.yml`'s push trigger
|
||||
(`feature/**`, `fix/**`, `docs/**`, `chore/**`). `feat/**` is **not** in that list, which
|
||||
is why PR #1's `feat/` branch produced only `pull_request` contexts. Require only the
|
||||
`pull_request` context, or PRs from non-matching prefixes will never satisfy the rule.
|
||||