docs(decisions): record CI runs 500/503 for gate-toolbox-container
gate / gate (pull_request) Successful in 2m20s
gate / conformance (pull_request) Skipped

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
jakman85andClaude Opus 5.5 committed 2026-11-08 00:26:27 -06:00
1 parent 27d603f726
commit 64c5617ddd
1 file changed
+15 -2
+15 -2
View File
@@ -82,10 +82,23 @@ new recurring operator touch.
the only stage not run** (no `SETTINGS_API_TOKEN` locally); L2/L3 conformance skipped as the only stage not run** (no `SETTINGS_API_TOKEN` locally); L2/L3 conformance skipped as
usual. rc 3 is not green. usual. rc 3 is not green.
- **CI, this PR's own runs** (Gitea API `/actions/runs/{id}/jobs` + job logs):
- run 500 (`514ed5d`, cold DinD cache: `Image exists? false`, image pulled): job 151s; set-up
incl. pull **9s**, checkout <1s, toolchain check 1s (all 8 pins `ok`), gate 140s → BLOCKED by
L0 `prod-baremetal-not-dev-surface` (umask, fixed above) + approval-policy.
- run 503 (`27d603f`, warm: `Image exists? true`): job **140s**; set-up 1s, checkout 1s,
toolchain check 0s, gate 137s. Every stage passes — l0 (incl. prod-baremetal-not-dev-surface),
lint, decisions-log, render-golden, l1, **gitea-settings** — except **approval-policy**,
the expected sensitive-path block. spec-immutability skipped (expected, no spec repo in CI).
- baseline before (runs 494/495, push on main): job 180s/179s; set-up 1–2s, checkout 1s,
**install 11s**, gate 164–165s. The install step is gone; the remaining ~25s gate-step delta
is NOT claimed as caused by this change (different base commits, one sample each).
- Re-gated locally on `27d603f` in the pinned image: rc 3, gitea-settings the only not-run stage.
## What I did NOT verify ## What I did NOT verify
- Renovate actually opening a digest-bump PR for gate.yml — only the regex was tested, not a - Renovate actually opening a digest-bump PR for gate.yml — only the regex was tested, not a
Renovate run. Renovate run.
- The authenticated fetch with the real job token — only CI can do that; the PR's own gate run is
that test.
- Push-to-main behaviour in CI (only the PR event runs before merge). - Push-to-main behaviour in CI (only the PR event runs before merge).
- Whether the gate-step speedup (165s → 137s) is real or run-to-run variance.
- That the cold-pull cost stays ~9s under a busier node or a bigger digest delta; one sample.