`ci/touched-requirements.sh` documents its detection as "R-* tokens literally
present in the diff of changed files". It did not do that — it grepped the ENTIRE
CONTENT of every changed file. So a change inherited every requirement those files
had ever mentioned in prose, and `--require-all` then blocked the merge on
requirements the author never went near.
On this branch that meant editing the decision log and the tofu docs dragged in
five unrelated requirements, all on untouched lines, all legitimately uncovered:
[coverage] REQUIRE: FAILED — required requirement(s) uncovered: [5 IDs]
The practical effect was that the PM could not append to the decision log without
failing CI — which is a fair part of why the log went stale in the first place.
This is the defect already logged as "FOLLOW-UP (WS-TEST): fix the matcher so real
requirements need not be exempted".
Two scoping rules, both learned from the gate blocking merges it should not have:
1. Scan the ADDED/REMOVED lines of the diff, as the header always claimed.
Removed lines count too — deleting a test's requirement tag, or a policy's
self-declared ID, touches that requirement just as much as adding one.
2. Skip `*.md`. An ID in prose is a REFERENCE, not a declaration: explaining a
requirement is not changing behaviour against it. Rule 1 alone is not enough —
a commit that documents a mis-attribution names the IDs involved and thereby
re-triggers the very mis-attribution it fixes, and the decision log can never
record which requirements a change concerned.
This TIGHTENS attribution rather than weakening the gate:
- no requirement is exempted, and DOCUMENTED_GAPS is untouched;
- authoritative declarations (`conformance.home.k3s/R-*` tags, Kyverno policies,
ServiceDefinitions) all live in YAML, on lines a real change must touch;
- the coarse path->requirement fallback is unchanged and file-type agnostic, so
the doc subtrees that matter (conformance/, schemas/, catalog/, clusters/, ci/)
stay covered either way.
Alternatives rejected: adding the five IDs to DOCUMENTED_GAPS genuinely weakens the
gate; scrubbing requirement IDs out of prose (precedent f9e9640) would mean editing
the decision log's own history to appease a matcher.
Gate semantics change — flagged in DECISIONS-LOG.md for review.
Also drops three R-TEST-06 mentions this branch had added to prose and refreshes
the now-stale "gate is RED" notes.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Adopt the spec's Phase-0 clarifications (spec now at pin a7fc19f) into the impl:
- schema v1.1: enforce exposure:public => auth.mode!=none (positive+negative tested).
- Kyverno: add longhorn=>size and longhorn=>NOT-reacquirable invariants (R-STATE-02/03).
- Ratify the homelab.keithjackson.dev/* label-key convention (now in spec docs/03).
- R-TEST-06 spec-immutability gate: ci/SPEC_PIN + ci/spec-immutability.sh + gate.sh
stage + Makefile target + a Gitea job (checks spec repo clean & at pin).
- touched-requirements.sh: conformance tags are the authoritative source.
Reconcile 3 CI seams the CI worker flagged (gate was RED, now GREEN):
- create schemas/validate.sh (SCHEMA_VALIDATE_CMD entrypoint) — L0 schema gate runs.
- fix l1.sh/conformance.sh to run.sh's real interface (fixed _artifacts/ paths; no
--junit/--coverage) and collect artifacts.
- exec bits on new scripts.
make -C ci gate => PASS (l0 skips locally w/o kyverno binary; green in CI).
Co-Authored-By: Claude Opus 4.8 (1M context) <[email protected]>