296d6d3275 |
Merge pull request 'feat(ci): the pipeline is the approver' (#17) from feat/ci-is-the-approver into main
Reviewed-on: #17 Reviewed-by: Keith Jackson <[email protected]> |
||
|
|
72a46ad82d |
chore(log): the handoff log was serialising every parallel branch
DECISIONS-LOG.md was append-only in ONE file and every agent appended to its
tail, so any two concurrent branches collided on the same last hunk. Measured
against the live Gitea today: four of the five open PRs were mergeable=false,
and `git merge-tree` named DECISIONS-LOG.md as the ONLY conflicting path in
all four.
#22 fix/crafty-oauth2-proxy-signin CONFLICT: DECISIONS-LOG.md
#20 feat/conformance-job-template CONFLICT: DECISIONS-LOG.md
#19 feat/conformance-trigger-kubeconfig CONFLICT: DECISIONS-LOG.md
#18 feat/conformance-runner-image CONFLICT: DECISIONS-LOG.md
#17 feat/ci-is-the-approver clean — it wrote no handoff
Nothing was wrong with any of those changes. The log's storage format
serialised work that was otherwise parallel, and the cost grew with every
concurrent branch (N branches -> N-1 rebases, each invalidating the gate run
before it). The agents work in isolated worktrees precisely so they do not
block each other; this one file undid that.
So: stop sharing a file. Handoffs are now one-per-file under decisions/,
named YYYY-MM-DD-<slug>.md. Disjoint paths have nothing to merge. There is
deliberately no index file (a shared mutable file is the thing that just
failed) and no counter (two agents would race for the same number) — the
directory listing is the index.
DECISIONS-LOG.md is frozen as the pre-2026-09-29 archive, its SHA-256 pinned
in decisions/ARCHIVE.sha256, and a new gate stage rejects any change to it.
That is a guard and not a paragraph because the old habit is written into the
runbooks and into every agent that has read the log, and getting it wrong does
not fail: it produces a clean-looking commit that re-creates the conflict on
OTHER branches, later, misattributed.
ci/decisions-log.sh new stage: archive pinned; every entry named with
a real date, carrying date/branch/title frontmatter
that agrees with its filename, and all three of
CLAUDE.md §7's sections with a real body under each.
Exit 0 or 1 only — no skip path by construction, so
no fail-open surface on a guard that closes one.
ci/gate.sh runs it; fail and (impossible) skip both BLOCK.
No REQUIRE_DECISIONS_LOG knob: a guard with an off
switch is not a guard.
ci/tests/decisions-log.test.sh 22 assertions, incl. the one that matters —
an append to the archive is rejected, and the
message names the file to write instead.
ci/tests/gate-decision.test.sh +3 assertions for the new wiring, AND a
pre-existing bug: the stub list never included
gitea-settings, so run_stage saw exit 127 and
recorded a FAILED stage in every case. 15 of 47
assertions failed on main for that reason alone —
the suite was measuring its own missing stub.
Now 50/50.
CLAUDE.md §7 rewritten; §2b widened to the new path.
ci/Makefile, ci/README.md, .gitea/workflows/README.md — stage named where
the other stages are named.
Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
|
||
|
|
0c6949ed98 |
feat(ci): the pipeline is the approver; humans approve changes to the pipeline
Implements the operator intent: "CI/CD pipeline is the end-all-be-all for approval. If the CI pipeline is not good enough to be trusted for this, then it is not good enough to do its intended job and needs to be improved. Manual approvers should only be for architecturally or security relevant changes." Adds ci/approval-policy.sh as a gate stage. A green gate becomes sufficient for an ordinary change; the one exception is structural rather than a matter of taste: A CHANGE TO THE GATE CANNOT BE GATED BY THE GATE. A PR that weakens a check would be approved by the weakened check. The same holds for the admission policies, the Flux wiring that decides what reconciles, the SOPS recipients and the RBAC. Those paths -- and only those -- still require an APPROVED review from someone other than the author. The list is data with a reason per entry (infra/gitea/approval-policy.json) and is itself a sensitive path, so the policy cannot be widened or narrowed without a human. FAIL-CLOSED, and deliberately the opposite of gitea-settings. There, a missing credential must not block every PR -- that is a lock-out. Here, a missing credential would let an unreviewed change to the gate merge, so "cannot evaluate" is a BLOCK. Verified against real PRs rather than fixtures: PR #16 (sensitive paths, approved by jakman85, author gitea-admin) -> PASS PR #6 (.gitea/workflows/gate.yml, ZERO reviews) -> BLOCK, naming the file push event (not a PR) -> N/A, exit 0 bogus token -> BLOCK, not skip Also caught before shipping: the first draft passed the PR file list with a second stdin redirect after a heredoc, which silently wins and leaves the script body unread. Running it found that; reading it would not have. required_approvals is NOT changed here. Flipping it live must happen together with the declaration in expected-branch-protection.json, or gitea-settings correctly fails on the drift -- that is a separate, deliberate change. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]> |
||
|
|
b2d9883958 |
docs(ci): close out the hardening -- land the scripts, correct a claim that shipped wrong
The branch-protection + PR-gate + sidecar sequence is complete and verified. This records the finished state and fixes what the sequence itself proved wrong. CORRECTS A FALSE CLAIM I SHIPPED. PR #7 said the sidecar conversion would remove the one-per-start dockerd line "http: TLS handshake error from 127.0.0.1: EOF". It does NOT. Exactly one still appears, immediately after "API listen on [::]:2376" -- it is now the startupProbe's FIRST attempt, landing microseconds after dockerd begins listening and cut off by timeoutSeconds: 1; the next poll succeeds. Cosmetic, and deliberately not chased: raising the timeout to hide one benign startup line would slow every subsequent poll. The manifest comment now states this instead of the wrong prediction. Lands infra/gitea/require-gate.sh and verify-then-enforce.sh, which drove the rollout from a session temp dir. verify-then-enforce.sh merges nothing -- merging is a human's reviewed act -- but forces the reconcile and ABORTS unless the pod is healthy, a runner is online, and a real workflow goes green on it, before enabling enforcement and probing the push. Re-run it after any future act-runner change. Trims the now-obsolete feat/ rationale from claim-ship.sh: per-branch push triggers were deleted, so no prefix produces a duplicate run any more. CLAUDE.md's enforcement table flips from "weaker than this rule" to machine-enforced, with all four rows marked verified and the push rejection noted as PROVOKED rather than assumed. It also now states what a green PR does NOT prove: CLUSTER_AVAILABLE is unset, so L2/L3 never runs in CI and only the L0/L1 offline subset is covered. infra/gitea/README.md marks the sequence done and names the root cause that remains unfixed: Gitea repo settings live in its own database, invisible to Flux and unreadable by the conformance gate, so NOTHING detects drift from what this directory declares. These scripts assert desired state; they are not a detector. The check that reads the live API and fails on divergence is the highest-value work left, and it is the difference between this being fixed and this being unable to recur. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]> |
||
|
|
e72050c690 |
docs: correct CI/platform documentation that was stale, wrong, or load-bearing
The 2026-09-29 session found the merge gate did not exist -- no branch protection, no runner -- while the tree asserted both. This corrects the documents that carried, and in several cases CAUSED, that belief. CLAUDE.md gains section 2b: never infer platform state from this repository. It carries the specific API and kubectl checks for protection, runners, CI status, workloads and Flux revisions, and the rule that a green tick is not proof anything ran (a skipped Gitea job reports success). This is the rule whose absence produced every other finding. .gitea/workflows/README.md and merge-gate.yaml both said "there is no remote git host, this file is dormant". Gitea had been live for weeks. Both were written as plans and never revisited once the plan completed. The Transition section is now marked COMPLETE and says what is genuinely still outstanding (CLUSTER_AVAILABLE unset, so L2/L3 never runs in CI). DECISIONS-LOG 2026-08-31 is annotated IN PLACE. Anyone reading chronologically previously hit "required status check; runner incluster-dind online" with nothing marking it false until a month later. The correction now sits on the bullet itself. ci/README.md, clusters/README.md and both conformance READMEs carry a status banner: they speak as though no cluster exists, which makes a live L2/L3 coverage gap read as an expected phase. That framing is why the gap went unexamined. apps/wave-1/gitea-actions-runner-secret.sops.yaml: fixed a wrong path, replaced advice to `sops -d` into a terminal (which CLAUDE.md forbids) with the rotation script, and recorded that a fresh token alone does not re-register a runner holding a stale /data/.runner. apps/wave-0/plex-claim-secret.sops.yaml: the header claimed the file ships the placeholder. It has not since the claim -- it holds the spent token, which is inert and deliberately left in place. catalog/plex.yaml and the plex secret both asserted a "~4-minute TTL" as fact. It was uncited, upstream documents no expiry, and it was the basis for a since-disproven claim that the pipeline was too slow to fit inside it. Measured: ~2m45s. Both .sops.yaml files were verified to still decrypt after the comment edits (`sops -d > /dev/null`), and render==golden confirms the catalog comment does not propagate into the rendered manifest. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]> |
||
|
|
234cc6a71a |
docs(gitea): a skipped job reports SUCCESS, not pending -- correct the deadlock claim
The runner came up on 2026-09-29 and the first CI jobs this repo has ever run went green, which falsified a claim merged in #2. MEASURED: gate / gate (pull_request) success 1m58s (PR 1), 1m34s (PR 2) gate / gate (push) success 1m32s (PR 2 only) gate / conformance (pull_request) success "Has been skipped" #2 said listing the conformance context as a required check would deadlock every PR, because the job is `if: false` and never runs. That is wrong. Gitea reports a skipped job as SUCCESS. Requiring it would not deadlock anything -- it would pass VACUOUSLY, forever, while nothing ran. The conclusion is unchanged (never require it) but the reason inverts, and the corrected reason matters more: under HARD RULE 4 a permanently-green check that verifies nothing is worse than a deadlock. A deadlock is loud. This is the exact fail-open shape the 2026-09-18 audit and this one both keep finding. Also records that the (push) contexts only appear for branches matching gate.yml's push trigger -- feature/**, fix/**, docs/**, chore/** -- and NOT feat/**, which is why PR 1's feat/ branch produced only pull_request contexts. Require the pull_request context alone, or PRs from non-matching prefixes never satisfy the rule. CLAUDE.md's enforcement table is updated: the runner half is genuinely fixed and observed green, the branch-protection half is not. Adds the warning that a green tick is not by itself evidence that anything ran. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]> |
||
|
|
5a9e455149 |
docs: delivery contract for agents + record that the merge gate does not exist
Going to land the plex claim wiring through the documented PR flow surfaced that the flow has never run. PR #1 is the first pull request this repo has ever had. Verified against the live Gitea, not inferred from the docs: * branch_protections is [] -- main is protected:false, enable_status_check:false, status_check_contexts:[], required_approvals:0, user_can_push:true * ZERO Actions runners registered at repo, org and site level DECISIONS-LOG 2026-08-31 asserts a "required status check" and a runner "incluster-dind online". Both are false of the live system. The gate is neither enforced nor able to run, and that went unnoticed because the log claimed otherwise -- the same fail-open class as the two holes found on 2026-09-18. Adds CLAUDE.md, the first agent-facing delivery doc here: the branch -> PR -> gate -> approval -> merge rule, stated alongside the honest fact that enforcement is currently weaker than the rule, so agents follow the rule rather than what they can get away with. Carries the toolbox gate invocation, the two git-worktree workarounds, the rc 0/1/3 contract, and secret handling. Records the ordering trap: enabling a required status check before a runner exists deadlocks every PR permanently, including the one that would fix it. Co-Authored-By: Claude Opus 5 (1M context) <[email protected]> |