Files
home-network-k3s-impl/CLAUDE.md
jakman85andClaude Opus 5 b52c8d1af6
gate / gate (pull_request) Successful in 1m46s
gate / conformance (pull_request) Has been skipped
fix(ci): accept the override from a PR review, and stop misdiagnosing an unreadable comments API
The override did not work on its first real test, and the reason was invisible
from the outside. Run 203 on PR #38: a well-formed `/approve-override` posted by
jakman85 in the PR comment box, 29 minutes newer than the head commit, and the
stage still blocked with:

    approval-override: COMMENTS_JSON is not a list

SETTINGS_API_TOKEN is minted [read:repository, read:admin], and Gitea puts
/issues/{n}/comments behind the *issue* scope — so Gitea answered with an error
OBJECT, `jq -e .` accepted it as valid JSON, and the stage fell through to 'no
approving review'. A permission failure wearing the costume of a missing
override. /pulls/{n}/files and /pulls/{n}/reviews are under read:repository,
which is why every other part of the same stage worked.

1. The diagnosis no longer lies. COMMENTS_JSON leaves the must-parse-or-block
   loop and is checked for being an ARRAY; when it is not, the stage prints
   Gitea's own .message, names the missing scope and says where to post instead.
   An unreadable source can only cause a false BLOCK, never a false pass, so a
   loud warning is the honest behaviour and blocking was not.
2. An override is accepted from a PR REVIEW body as well as a comment, so the
   hatch is not hostage to one API scope — a review of type 'Comment' works on
   the token CI has today. The gate names which source it used; PENDING
   (unsubmitted, author-only) reviews are dropped.
3. set-ci-token.sh requests read:issue, making the ordinary comment box work —
   on a RE-RUN only, since an existing token's scopes cannot be widened.

ci/tests/approval-override.test.sh: 23 -> 38 assertions, covering the reviews
source, PENDING reviews, an error object from the comments API, 'an unreadable
comments source must not suppress a valid review override', latest-wins across
both sources, and that the diagnostic quotes Gitea's message.

Also measured and recorded: run 203 shows gitea-settings PASS after the operator
ran the live PATCH, with block_admin_merge_override still true — the narrow
change held, the approval count moved and the gate's teeth did not.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-10-02 00:50:20 -05:00

12 KiB

CLAUDE.md — how work lands in this repo

Read this before doing anything durable. It is the delivery contract for AI coding sessions and agents. The newest entry in decisions/ is the current PM handoff and takes precedence on what to work on; this file governs how it lands.

1. Never push to main. Ever.

Every durable change reaches main exactly one way:

branch  ->  push the branch  ->  open a PR  ->  CI gate green  ->  human approval  ->  merge

There is no other path. Specifically:

  • Do not git push origin main.
  • Do not git push origin HEAD:main. Same thing wearing a hat.
  • Do not merge your own PR. See the approval model below — and either way, the merge is someone else's action, never yours.

Who approves

The CI/CD pipeline is the approver. A green gate is sufficient for an ordinary change; the branch requires no human approval for one. That is a deliberate transfer of authority, on the operator's stated principle: if the pipeline is not good enough to be trusted for this, it is not good enough to do its job and needs improving — so a weak gate is a bug to fix, not a reason to add a human.

One exception, enforced by ci/approval-policy.sh: a change to the pipeline itself, the admission policies, the Flux wiring, the SOPS recipients, the RBAC, or this file needs an approving review from someone who is not its author. The reason is narrow and structural — a change to the gate cannot be gated by the gate. A PR that weakens a check would be approved by the weakened check. Everything else merges on green.

The path list is data, with a reason per entry: infra/gitea/approval-policy.json. It is itself a sensitive path, so the policy cannot be widened or narrowed without a human.

That stage is fail-closed — if it cannot evaluate, it blocks. Unlike gitea-settings, where a missing credential is a lock-out, here a skip would be a bypass.

The administrator override (2026-10-01). The rule above was unsatisfiable for the one human who runs this repo: Gitea refuses to let an author approve their own PR, and jakman85 is the only collaborator — so a sensitive-path PR the operator opened could never be merged, including the PR that would fix that. An administrator may therefore waive the review by posting this on the PR:

/approve-override <reason>

Post it as a PR review of type "Comment", not in the plain comment box. CI's SETTINGS_API_TOKEN is minted [read:repository, read:admin], and /issues/{n}/comments sits behind Gitea's issue scope — so an override typed into the comment box is invisible to CI, and the stage reports it as a missing approval rather than as a permission problem (measured on PR #38, 2026-10-02). /pulls/{n}/reviews is readable, so a review body works today. Both sources are accepted and the gate names which it used; the comment box starts working once infra/gitea/set-ci-token.sh is re-run to pick up read:issue.

The directive must start a line, the reason is mandatory, the poster's admin/owner permission is re-checked live when the gate runs, and it must be newer than the head commit — push again and you must override again. The overrider, the timestamp and the reason are printed in the gate log and the job summary. For an administrator, "a change to the gate cannot be gated by the gate" is therefore advisory, not structural; what is kept is an attributed record of each waiver. Note that the agent account gitea-admin also holds owner here, so an agent can clear this on its own PR — do not: posting that directive to unblock your own agent work is exactly the self-approval the stage exists to prevent. Get the operator to post it, or move the change out of the sensitive paths.

required_approvals on main is 0, not 1 — the gate is the approver. That drops the approval count only: block_admin_merge_override and enable_status_check both remain true, so a red gate is unmergeable by everyone, administrators included.

  • Do not kubectl apply / edit / patch a durable change. Flux reconciles main; anything applied by hand is drift that the next reconcile reverts or, worse, adopts.

Many runbooks under runbooks/ still say git push origin main IS the deploy. That wording is stale — it predates the PR flow. It describes what Flux does (main is what the cluster follows), not what you are permitted to do. Honour this file, not that line. Fixing those runbooks is tracked work.

2. Enforcement (as of 2026-09-29: the rule is now MACHINE-ENFORCED)

Verified against the live Gitea on 2026-09-29:

Expected Actual
main protected, direct push rejected ✅ protected: true, user_can_push: false — verified by a real rejected push, not by the API's word
PR blocked until the gate passes ✅ enable_status_check: true, context gate / gate (pull_request)
Gate runs on every PR ✅ runner incluster-dind online; ~1m35s
Gate cannot be overridden, by anyone ✅ block_admin_merge_override: true
Human approval required before merge ⬜ No — required_approvals: 0 since 2026-10-01. The gate is the approver; sensitive paths are gated by ci/approval-policy.sh instead. See §1

The first three were FALSE as recently as 2026-09-29, while this repo's own log asserted they were true. They are true now because each was measured, and the push rejection was provoked rather than assumed. Re-measure before relying on any of them — see §2b.

The fourth row deliberately changed on 2026-10-01. required_approvals: 1 was a lock-out, not a protection: with a single collaborator and Gitea refusing author self-approval, nothing could satisfy it (measured on PR #35 — green gate, zero reviews, unmergeable). It also contradicted the model already written into ci/approval-policy.sh and ci/gate.sh. Rationale and the live-change script: infra/gitea/allow-admin-self-merge.sh.

Still not covered: vars.CLUSTER_AVAILABLE is unset, so L2/L3 conformance does not run in CI. A green PR therefore proves the L0/L1 offline subset, not runtime behaviour.

Consequence for you: CI now runs, but it does not yet block anything. Always run the toolbox gate yourself and quote its numbers. Never describe a PR as "green" on the strength of a check you have not seen report — and note that a skipped Gitea job reports as success, so a green tick is not by itself evidence that anything ran.

2b. Never infer platform state from this repository

This repo is not evidence about the live platform. Neither is the handoff log (decisions/, and the frozen DECISIONS-LOG.md archive). Both describe what someone believed at the time of writing, and both have been confidently wrong for a month at a stretch.

On 2026-09-29 the log stated the merge gate was a required status check with a runner online. The API said branch_protections: [] and zero runners. Everything downstream of that belief — "the gate enforces this", "your push would be rejected", "CI covers it" — was wrong, and nothing in the tree could have revealed it, because the tree was the source of the error.

So, before asserting that any gate, protection, runner, secret, or workload is in a given state: query the thing itself.

Claim about... Check
branch protection / required checks GET /api/v1/repos/{owner}/{repo}/branches/main
a runner exists GET /api/v1/admin/actions/runners
CI actually ran the commit's /statuses — and read the description; a skipped Gitea job reports success with "Has been skipped"
a workload / Secret / env kubectl --context k3s-prod ... (read-only is fine for agents)
Flux applied your commit compare .status.lastAppliedRevision against the GitRepository's artifact revision

Quote the measured field, not the prose. If you cannot measure it, say so explicitly — "unverified" is a legitimate report, and a far better one than a confident guess that matches the docs.

A green tick is not proof anything ran. Read what actually executed.

3. Gate before you push

./infra/devcontainer/dev.sh run bash -c './ci/gate.sh'

Exit codes are a contract — do not flatten them:

rc Meaning
0 PASS
1 BLOCKED — something failed
3 UNDETERMINED — a stage did not run. Never report this as green.

spec-immutability reaches rc 3 whenever the sibling spec repo is not checked out beside this one; that single skip is expected and tolerated. Any other skip is a real gap in your run.

Never gate on the host. promtool and kustomize are not on the host $PATH, so checks SKIP and you get a false rc 3. Only the pinned toolbox result counts.

Running the gate from a git worktree

Two unrelated failures, both with known workarounds — put both in any agent brief:

  1. dev.sh refuses to start: infra/ansible/.cache/prod.kubeconfig is untracked and exists only in the main checkout. Do not copy it (it is a credential). Use DEV_KUBECONFIG=/dev/null — the gate contacts no cluster, so L2/L3 scaffold-skip normally.
  2. Every git call inside the container fails: a worktree's .git is a pointer to a gitdir outside the mounted root. dev.sh takes no extra-mount flag, so inject one via the ENGINE hook — a shim that intercepts run and re-execs podman run -v /path/to/main/.git:/path/to/main/.git:ro "$@". A traceback in tracked_files() is this bug, not a broken tree.

4. Branch naming

Use feat/, fix/, docs/, chore/. Note that .gitea/workflows/gate.yml's push trigger lists feature/** — not feat/** — so branch pushes get no fast-feedback run. The pull_request trigger fires regardless of branch name, so the PR gate is unaffected.

5. Cluster access

kubectl does not work on the operator workstation; the toolchain lives only in the pinned container. Always name the context explicitly:

./infra/devcontainer/dev.sh run bash -c 'kubectl --context k3s-prod get nodes'

dev.sh merges both clusters and picks a current-context per invocation; that default has already changed once. Never rely on it. Do not run two dev.sh invocations concurrently.

Mutating kubectl and flux reconcile are operator actions, not agent actions.

6. Secrets

  • Never sops -d a file into a terminal, a log, or a transcript.
  • Never print a Secret's .data/.stringData when checking whether it exists — list key names or object names only. A password has been leaked into a transcript this way before.
  • Encrypted files are *.sops.yaml or live under secrets/. The root .sops.yaml is the single creation-rules file; do not add a second one in a subtree.
  • A short-lived credential (e.g. a plex.tv claim token, ~minutes) cannot survive the PR flow. Do not design around committing one — read the expiry from the issuing page and treat a burnt token as free to retry.

7. Before you finish — write a handoff entry, in its OWN file

Add one new file:

decisions/YYYY-MM-DD-<slug>.md          <slug> = your branch's last segment

with frontmatter (date, branch, title) and exactly these three sections:

## What changed
## What I verified
## What I did NOT verify

State gaps plainly — an honest "UNVERIFIED" is worth more than an optimistic "green", and this repo has already been burned by the difference. All three headings are enforced by ci/decisions-log.sh, because the third is the one that gets dropped. Template and full rationale: decisions/README.md.

Do NOT append to DECISIONS-LOG.md. It is a frozen archive (pre-2026-09-29), its SHA-256 is pinned in decisions/ARCHIVE.sha256, and the merge gate rejects any change to it. Appending to its tail is what every agent used to do, and because every branch appended to the same last hunk, no two concurrent branches could auto-merge. Measured on 2026-09-29: four of the five open PRs were mergeable: false, with DECISIONS-LOG.md the only conflicting path in all four — none of those changes had anything to do with each other. Separate files have nothing to merge, which is the entire fix. Note that the damage from getting this wrong lands on other people's branches, later, which is why it is a gate stage and not a request.

Many older handoff entries and runbooks say "append to DECISIONS-LOG.md". That wording is stale, in the same way §1's git push origin main wording is stale.