Task T-0.2 · Requirements R-GITOPS-01, R-TEST-02, R-TEST-03 · Owner WS-GITOPS (CI).
This is the merge gate for the home k3s + Longhorn platform. It enforces the gating rules in the
spec (docs/14-testing-and-conformance.md,
ADR-0010,
ADR-0011) as a
Gitea Actions pipeline: no change lands on main unless the conformance subset for the requirements
it touches is green (R-TEST-03).
Done is a green, reproducible, requirement-tagged test — never "merged," never a demo. This gate is the machine that enforces it.
The pipeline
decisions-log ─▶ lint ─▶ l0 (schema + Kyverno) ─▶ render-golden ─▶ l1 (rendering) ─▶ conformance (L2/L3) ─▶ merge-gate decision
└──────────────── run in CI, NO cluster ────────────────┘ └── in-cluster Chainsaw Job ──┘
live now cluster-gated (SKIPS in Phase 0)
| Stage | Job | Layer | Verifies | Cluster? |
|---|---|---|---|---|
| yaml/lint | lint |
— | YAML well-formed (ci/yamllint.yaml) |
no — live now |
| schema | l0 |
L0 | ServiceDefinitions valid against schemas/ |
no — live now |
| Kyverno L0 | l0 |
L0 | kyverno test platform/kyverno/: default-deny baseline present, no plaintext secrets, required labels/egress-class, schema conformance |
no — live now |
| L1 rendering | l1 |
L1 | ServiceDefinition → rendered resources match golden expectations (Chainsaw L1 via conformance/) |
no — live now |
| conformance | conformance |
L2+L3 | Real runtime behavior + fault-injection, as an in-cluster Chainsaw Job CI triggers and awaits | yes — cluster-gated |
| decision | merge-gate |
— | Applies R-TEST-03 over the above; blocks merge on any failure | no |
Each stage is a thin wrapper over a ci/*.sh script, so CI and a laptop run the identical gate
(R-TEST-02). See ../../ci/README.md.
Why L2/L3 is an in-cluster Job (not run by CI directly)
Per docs/14 §"Where each layer runs"
and ADR-0011: CI holds no broad kubeconfig. L2/L3 run as an in-cluster Chainsaw Job whose own
scoped test ServiceAccount holds cluster access (R-SEC-02). CI only triggers the Job and
collects its artifacts, using a narrow trigger credential referenced by secret name only
(secrets.CONFORMANCE_TRIGGER_KUBECONFIG) — never a plaintext secret, never a cluster-admin kubeconfig.
Honest SKIP — never fake green
NOTE (2026-09-29): this section is written in the past's voice — "Phase 0", "no cluster exists". A cluster has existed for weeks and Flux has been reconciling against it. The skip logic below is still correct and still honest, but read it as describing a live coverage gap (L2/L3 is not wired into CI) rather than an expected phase. Its being phrased as a phase is part of why the gap went unexamined.
Originally: The gate is deliberately built so unavailable checks SKIP loudly, they do not pass:
- The
conformancejob isif: ${{ vars.CLUSTER_AVAILABLE == 'true' }}— with no cluster it is skipped by Gitea (shown as skipped, not green). Themerge-gatedecision then reports any touched requirement that needs L2/L3 as UNVERIFIED, not satisfied. - Stages whose owning subtree is still a placeholder (
schemas/,platform/kyverno/,conformance/) report SKIPPED — unwired, distinct from a pass, until those seams are delivered.
The decision matrix (scripts/decide.sh):
| Situation | Outcome |
|---|---|
| Any of lint/l0/l1 fails | BLOCK |
| conformance fails/cancelled | BLOCK |
conformance skipped while CLUSTER_AVAILABLE=true |
BLOCK (it should have run) |
| conformance skipped, no cluster, touched reqs need L2/L3 | UNVERIFIED — reported, not green; blocks only if REQUIRE_CLUSTER_TESTS=true |
| lint/l0/l1 green, no cluster-needing reqs touched | PASS |
REQUIRE_CLUSTER_TESTS is false in Phase 0 (bootstrap: seams and cluster don't exist yet) and flips
to true from Phase 1 once a dev/test cluster is declared — from then on, any touched requirement that
can't be verified is a hard block.
Artifacts (R-TEST-04 traceability)
Every layer emits machine-readable output collected by the merge-gate:
- JUnit XML →
results/junit/*.xml(uploaded asl1-junit-coverage/conformance-junit-coverage). - Requirement-coverage report →
reports/coverage/**— maps everyR-*to its verifying test(s); uncovered requirements are visible gaps. Produced by the conformance runner (conformance/, WS-TEST).
Both dirs are git-ignored (see .gitignore).
Triggers & branch model (CONTRIBUTING.md)
pull_request→main: PRs are the enforced merge gate intomain.push→mainonly. The per-branch prefix list was removed:act_runnerruns at capacity 1, so a branch push fires a redundant run that serialises ahead of the PR run for the same tree. No work onmain— and since 2026-09-29 that is enforced, not conventional:mainis a protected branch and a direct push is rejected by the pre-receive hook (verified, not assumed).
Transition: COMPLETE (2026-09-29)
This section used to describe a migration as pending. It has happened. Gitea is live at
gitea.home.keithjackson.dev, the runner incluster-dind is registered and online, and
gate.yml runs on every PR.
What took a month to notice: the migration was recorded as done on 2026-08-31 without
anyone checking the platform. In reality main had no branch protection and zero
runners were registered until 2026-09-29. Every "the gate enforces this" statement in
between rested on an assertion nobody verified. PR #1 — the first pull request this
repository ever had — sat pending for 30.6 minutes because nothing existed to run it.
So: do not read this file, or the DECISIONS-LOG, as evidence about the live platform.
Query the API. infra/gitea/ holds the scripts and the measured state.
Still genuinely outstanding: vars.CLUSTER_AVAILABLE and
secrets.CONFORMANCE_TRIGGER_KUBECONFIG are unset, so L2/L3 conformance does not run in
CI. That is a real coverage gap, not a phase.
Configuration (set in Gitea; referenced by name only)
| Kind | Name | Purpose |
|---|---|---|
| variable | CLUSTER_AVAILABLE |
'true' once a dev/test cluster exists → L2/L3 run and are required; else they SKIP |
| variable | REQUIRE_CLUSTER_TESTS |
'true' (Phase 1+) makes unverified cluster-needing touched reqs a hard block |
| secret | CONFORMANCE_TRIGGER_KUBECONFIG |
narrow creds to create/await the in-cluster Chainsaw Job (not cluster-admin) |
How images are built
This repo's three images — toolbox (infra/devcontainer/), agent-runner (infra/agent/,
built FROM the toolbox) and conformance-runner (conformance/incluster/) — are built,
verified and published by images.yaml, never from a workstation
(operator rule, 2026-10-29). The logic is in scripts/images.sh.
The builder is rootless BuildKit (platform/buildkit/),
reached over mTLS with a pinned buildx — no job here touches a Docker daemon, privileged or
otherwise (operator decision on PR #81). The client certificate reaches jobs as the Actions
secrets BUILDKIT_CA, BUILDKIT_CLIENT_CERT, BUILDKIT_CLIENT_KEY.
Verification is a build target. Each Containerfile ends in a verify stage that runs every
in-image assertion at build time as the non-root uid with RUN --network=none (tool presence and
pinned versions, PM_SELFTEST=1 pm-dispatch, the pm-worker probe, the conformance-clone
refusals, no writable path outside the workspace). The pipeline builds <image>-verify before it
builds, let alone pushes, the image. Build args come from each image's own
build-image.sh --print-build-args, which is also the local podman path — so the recipe and the
proof exist once.
| Trigger | What happens |
|---|---|
| pull request touching an image's inputs | build + verify only. Nothing is pushed and no registry credential is referenced |
push to main touching an image's inputs |
build + verify + publish to gitea.home.keithjackson.dev/home-network/<image> as sha-<commit> (immutable) and main (moving); the registry-returned digest is in the job summary |
workflow_dispatch |
the same as a push when run on main (all images by default); verify-only elsewhere |
Only images whose inputs changed are built. The publish job never writes to git: Renovate
follows each image's main tag through a # renovate-digest: marker next to every digest
reference (platform/pm-agent/, infra/agent/versions.env, conformance/versions.env) and
opens the bump PR, which goes through the gate like anything else. A PR opened with the Actions
token would not trigger the required gate, which is why it is Renovate's job and not this one's.
Credential: the repository secret REGISTRY_PUSH_TOKEN (scope write:package, owned by an
account with package write on the org). The automatic Actions token cannot push in Gitea 1.24.3
— the reasoning, with source citations, is in the header of images.yaml. Retention:
infra/gitea/registry-retention.sh, an operator
action, keeps every digest git pins plus the newest tags.
Cost: the job shares the single act_runner slot with the gate, but the build itself runs in the
buildkitd pod, not in DinD, so the runner's disk and memory are untouched. Until
platform/buildkit is deployed and its client certificate copied
(infra/gitea/buildkit-client-secret.sh), the job fails loudly at its builder preflight.
Files
.gitea/workflows/
merge-gate.yaml the pipeline (lint → l0 → l1 → conformance → decision)
images.yaml build/verify/publish this repo's container images (see above)
cve-triage.yaml scheduled CVE triage bot (R-VULN-05/07, ADR-0027; runs before Renovate)
scripts/
install-tools.sh installs the pinned tools per stage (from ci/versions.env) — used by the
dormant merge-gate.yaml blueprint only; gate.yml runs in the toolbox image
decide.sh the R-TEST-03 merge decision over job results
images.sh the image pipeline's driver (what to build, base, push, digest)
cve_triage.py the CVE triage bot: reads the scanner report, maintains the counts-only
CVE Dashboard issue, ticks Renovate approval rows (cve-triage.yaml)
README.md this file