Compare commits

...
Author SHA1 Message Date
jakman85andClaude Opus 5 234cc6a71a docs(gitea): a skipped job reports SUCCESS, not pending -- correct the deadlock claim
gate / gate (push) Successful in 1m33s
gate / gate (pull_request) Successful in 1m32s
gate / conformance (push) Has been skipped
gate / conformance (pull_request) Has been skipped
The runner came up on 2026-09-29 and the first CI jobs this repo has ever run went
green, which falsified a claim merged in #2.

MEASURED:
  gate / gate (pull_request)          success   1m58s (PR 1), 1m34s (PR 2)
  gate / gate (push)                  success   1m32s (PR 2 only)
  gate / conformance (pull_request)   success   "Has been skipped"

#2 said listing the conformance context as a required check would deadlock every PR,
because the job is `if: false` and never runs. That is wrong. Gitea reports a skipped
job as SUCCESS. Requiring it would not deadlock anything -- it would pass VACUOUSLY,
forever, while nothing ran.

The conclusion is unchanged (never require it) but the reason inverts, and the corrected
reason matters more: under HARD RULE 4 a permanently-green check that verifies nothing is
worse than a deadlock. A deadlock is loud. This is the exact fail-open shape the
2026-09-18 audit and this one both keep finding.

Also records that the (push) contexts only appear for branches matching gate.yml's push
trigger -- feature/**, fix/**, docs/**, chore/** -- and NOT feat/**, which is why PR 1's
feat/ branch produced only pull_request contexts. Require the pull_request context alone,
or PRs from non-matching prefixes never satisfy the rule.

CLAUDE.md's enforcement table is updated: the runner half is genuinely fixed and observed
green, the branch-protection half is not. Adds the warning that a green tick is not by
itself evidence that anything ran.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-09-29 01:07:13 -05:00
jakman85 69a0d1a1c7 Merge pull request 'docs: delivery contract for agents + record that the merge gate does not exist' (#2) from docs/ci-delivery-flow-for-agents into main
gate / gate (push) Successful in 1m34s
gate / conformance (push) Has been skipped
Reviewed-on: #2
2026-09-29 05:50:31 +00:00
2 changed files with 35 additions and 10 deletions

No files matched your search

+9 -7
View File
@@ -31,17 +31,19 @@ Verified against the live Gitea on 2026-09-29:
|---|---|
| `main` protected, direct push rejected | **No branch protection.** `protected: false`, `user_can_push: true` |
| PR blocked until the gate passes | **`enable_status_check: false`**, `status_check_contexts: []` |
| Gate runs on every PR | **No Actions runner is registered** (repo, org and site level all report zero) |
| Gate runs on every PR | **Fixed 2026-09-29.** Runner `incluster-dind` is online; `gate / gate (pull_request)` runs and passes in ~1m30s–2m |
| Approval required before merge | **`required_approvals: 0`** |
So nothing mechanically stops you from pushing to `main` right now. **That is a gap
being closed, not permission.** `DECISIONS-LOG.md` (2026-08-31) claims the gate is a
"required status check" with a runner online; that claim is not true of the live
system, which is how this went unnoticed.
being closed, not permission.** `DECISIONS-LOG.md` (2026-08-31) claimed the gate was a
"required status check" with a runner online; neither was true, which is how this went
unnoticed for a month. The runner half is now genuinely fixed and observed green. The
protection half is not — see `infra/gitea/`.
**Consequence for you:** because CI cannot run, the **local toolbox gate is the only
real gate**. Run it and quote its numbers in your report. Never describe a PR as
"green" on the strength of CI that did not execute.
**Consequence for you:** CI now runs, but it does not yet *block* anything. Always run
the toolbox gate yourself and quote its numbers. Never describe a PR as "green" on the
strength of a check you have not seen report — and note that a **skipped** Gitea job
reports as `success`, so a green tick is not by itself evidence that anything ran.
## 3. Gate before you push
+26 -3
View File
@@ -54,6 +54,29 @@ commands.
4. Add the human reviewer as a repo collaborator, then raise `required_approvals` to 1.
> **Do not do step 3 before step 1.** A required status check with no runner leaves every
> PR permanently pending — including the PR that would fix it. The same applies to
> `gate.yml`'s `conformance` job: it is `if: false` and never runs, yet still publishes a
> `gate / conformance (pull_request)` context. Never list that one as required.
> PR permanently pending — including the PR that would fix it. That half is measured: PR #1
> sat `pending` for 30.6 minutes across 122 polls with no runner registered, and never
> reported.
### Measured, once the runner came up (2026-09-29)
The first CI jobs this repo ever ran, on PR #1 and PR #2:
| Context | Result | Time |
|---|---|---|
| `gate / gate (pull_request)` | success | 1m58s (PR #1), 1m34s (PR #2) |
| `gate / gate (push)` | success | 1m32s (PR #2 only) |
| `gate / conformance (pull_request)` | **success — "Has been skipped"** | — |
**Require `gate / gate (pull_request)`. Do NOT require either `conformance` context —
but not for the reason an earlier draft of this file gave.** A skipped Gitea Actions job
does not hang a status check: Gitea reports it as **`success`** with the description
"Has been skipped". So requiring it would not deadlock anything — it would pass
*vacuously*, every time, forever, while nothing ran. Under HARD RULE 4 that is worse than
a deadlock: a deadlock is loud, a permanently-green check that verifies nothing is
exactly the fail-open shape this repo keeps finding.
The `(push)` contexts appear only for branches matching `gate.yml`'s push trigger
(`feature/**`, `fix/**`, `docs/**`, `chore/**`). `feat/**` is **not** in that list, which
is why PR #1's `feat/` branch produced only `pull_request` contexts. Require only the
`pull_request` context, or PRs from non-matching prefixes will never satisfy the rule.