Retire Kasm from the catalog. Drop ACME revocation from R-TLS-02. Make L3 fault injection operator-run and exclude it from the merge gate (R-TEST-03, ADR-0026). Update the gap register to match; Homepage authentication is now ruled must-enforce and stays a gap until the implementation lands. Co-Authored-By: Claude Opus 5.5 <[email protected]>
38 lines
2.2 KiB
Markdown
38 lines
2.2 KiB
Markdown
# ADR-0026 — Fault injection is operator-run, never automated
|
|
- Status: Accepted
|
|
- Date: 2026-11-08
|
|
- Serves: R-TEST-03, R-TEST-05, R-ENV-03
|
|
- Supersedes: the L3 portion of ADR-0010's merge gating and of ADR-0011's CI-triggered harness
|
|
- Accepted by: operator ruling of 2026-11-08; effective on merge.
|
|
|
|
## Context
|
|
[ADR-0010](adr-0010-conformance-testing.md) has the conformance suite gate merges, and
|
|
[ADR-0011](adr-0011-test-tooling-kyverno-chainsaw.md) has CI trigger L2 and L3 as an in-cluster Job.
|
|
Both were written when a dev/test cluster existed to break.
|
|
[ADR-0017](adr-0017-single-environment-bare-metal-production.md) retired that cluster, so production
|
|
is now the only target. An L3 test takes the VPN tunnel down, kills a node, injects a bad update or
|
|
restores a backup. Running that automatically would put a production outage on a pipeline's
|
|
schedule, and the operator sees no reason to do so.
|
|
|
|
## Decision
|
|
- **L3 fault-injection tests are never triggered by CI, a schedule or any other automation.** The
|
|
operator starts them deliberately, at a chosen time.
|
|
- **L3 does not gate individual merges.** The merge gate covers the automatable layers.
|
|
- **Fault injection stays required.** R-TEST-05 is unchanged: safety-critical behaviors are still
|
|
verified by fault-injection tests, using the same in-cluster Job and scoped test identity. Each
|
|
operator run is recorded in the implementation's run ledger.
|
|
- ADR-0011's decision stands for L2, and for L3's tooling and harness.
|
|
|
|
## Alternatives considered
|
|
- **Automate L3 against production on a schedule** — rejected by the operator: a deliberate outage
|
|
has no business being unattended.
|
|
- **Rebuild a dev/test cluster to automate against** — cost with no stated need; ADR-0017 retired it.
|
|
- **Retire fault-injection tests altogether** — not ruled. R-TEST-05 protects properties such as the
|
|
VPN kill-switch and data survival, which happy-path checks cannot prove.
|
|
|
|
## Consequences
|
|
- No credential or pipeline path can start a fault against production.
|
|
- A merge can change a safety-critical behavior without its L3 test re-running, so an L3 proof can go
|
|
stale. The implementation's status tooling reports that staleness; re-running is an operator choice.
|
|