docs: delivery contract for agents + record that the merge gate does not exist #2

Merged
jakman85 merged 4 commits from docs/ci-delivery-flow-for-agents into main 2026-09-29 05:50:32 +00:00
4 Commits
Author SHA1 Message Date
jakman85 d3a0d587a4 Added gitea action runner secret
gate / gate (push) Successful in 1m32s
gate / gate (pull_request) Successful in 1m34s
gate / conformance (push) Has been skipped
gate / conformance (pull_request) Has been skipped
2026-09-29 00:50:02 -05:00
jakman85andClaude Opus 5 fe862ab527 infra(gitea): recover the Actions runner before anything requires the gate
gate / gate (push) Has been cancelled
gate / conformance (push) Has been cancelled
gate / gate (pull_request) Successful in 1m32s
gate / conformance (pull_request) Has been skipped
No runner is registered at repo, org or site level, so gate.yml has never executed.
PR #1 sat pending for 30.6 minutes across 122 polls and never reported. Requiring the
gate as a status check in that state would lock the repo permanently.

Adds runner-token-rotate.sh: mints a fresh instance-level registration token from the
Gitea API and writes it into the SOPS secret via sops set, without ever printing the
value.

Records the likely root cause, which a new token alone does NOT fix. act_runner
registers once and persists its identity in /data/.runner on the act-runner-data PVC.
If Gitea no longer holds a matching runner row, the pod starts, sees .runner, SKIPS
registration entirely, and polls with an identity Gitea does not recognise. Symptom:
zero runners, pod running, nothing obviously broken. Clearing the PVC is what forces a
genuine re-registration.

The README now sequences runner-first, enforcement-second, and requires CONFIRMING the
runner reports online rather than assuming it. That assumption is the whole defect:
DECISIONS-LOG recorded the runner as online on 2026-08-31 and nobody checked since.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-09-29 00:43:47 -05:00
jakman85andClaude Opus 5 a2665c0511 infra(gitea): script the branch protection that was never applied
gate / gate (push) Has been cancelled
gate / conformance (push) Has been cancelled
gate / gate (pull_request) Successful in 1m33s
gate / conformance (pull_request) Has been skipped
Gitea repo settings live in its own database, not in a manifest Flux reconciles, so
they are drift-prone and invisible to the conformance gate -- which is how main came
to accept direct pushes while the log recorded it as protected.

Adds infra/gitea/branch-protection.sh (blocks direct pushes to main) and a README
carrying the measured before-state and the ORDER the remaining steps must happen in.

The script deliberately leaves enable_status_check:false and required_approvals:0.
Both would deadlock today: there is no runner to satisfy a required context, and the
only human account is not yet a repo collaborator, so no one could supply an approval.
The README sequences both.

It prints a push probe to run afterwards. The API response is not proof -- Gitea may
let site admins bypass protection, and that has to be observed, not assumed.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-09-29 00:20:12 -05:00
jakman85andClaude Opus 5 5a9e455149 docs: delivery contract for agents + record that the merge gate does not exist
gate / gate (push) Has been cancelled
gate / conformance (push) Has been cancelled
gate / gate (pull_request) Successful in 1m33s
gate / conformance (pull_request) Has been skipped
Going to land the plex claim wiring through the documented PR flow surfaced that
the flow has never run. PR #1 is the first pull request this repo has ever had.

Verified against the live Gitea, not inferred from the docs:
  * branch_protections is [] -- main is protected:false, enable_status_check:false,
    status_check_contexts:[], required_approvals:0, user_can_push:true
  * ZERO Actions runners registered at repo, org and site level

DECISIONS-LOG 2026-08-31 asserts a "required status check" and a runner
"incluster-dind online". Both are false of the live system. The gate is neither
enforced nor able to run, and that went unnoticed because the log claimed
otherwise -- the same fail-open class as the two holes found on 2026-09-18.

Adds CLAUDE.md, the first agent-facing delivery doc here: the
branch -> PR -> gate -> approval -> merge rule, stated alongside the honest fact
that enforcement is currently weaker than the rule, so agents follow the rule
rather than what they can get away with. Carries the toolbox gate invocation, the
two git-worktree workarounds, the rc 0/1/3 contract, and secret handling.

Records the ordering trap: enabling a required status check before a runner exists
deadlocks every PR permanently, including the one that would fix it.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
2026-09-29 00:11:58 -05:00